Q&EHS

Plant EHS Installation

Position:Home>Plant EHS Installation
  • Process operating procedures include safety and health considerations,safety systems and their fuctions.

  • All employees are required to be trained on process including EHS matters before allowed to operate on a newly assigned process.

  • Ventilations are available in labs,offices and workshops,and EHS regulates and tests these ventilation equipment regularly.

  • Storage facilities are used on the site, include warehouse, tank farm, drum storage area, waste storage area.And the facilities are installed with special protective systems and clearly labeled to indicate their contents.

  • Materials Movements Training

  • Materials Receipt & Acceptance

  • Tanker Unloading

  • Storage in Tanks

  • Containment

  • Maintenance and calibration systems for EHS critical equipments: safety protection systems, lifting equipment, pressure vessels, ventilation equipment,etc.